Temperatures have risen and the ground is thawing. Now our carefully measured lines on the building pad that were taut, are now slack and adrift.
Aside from odd jobs, the only thing to do is take Kit to the train station. He'll be away until Wednesday. Will miss him but I have plenty to keep me occupied.
1) Lay a pathway to the static. The thawed ground is now soaked and muddy.
2) Turn over the vegetable beds ready for planting around January.
3) Dig a 100m trench 6 inches deep in order to fence an enclosure for our rabbit farming venture.
Not a long list, but a tidy amount to do. Will get cracking tomorrow.
M Jones
No comments:
Post a Comment
Welcome and thank you for visiting my blog.