GunBidder.co.uk

GunBidder.co.uk
The UK's Premier Gun Auction Site

Search This Blog

Showing posts with label boiler. Show all posts
Showing posts with label boiler. Show all posts

Hardcore Bargains - Sunday 27/02/11

Have given up on the boiler. All looked promising until a drip developed and increased in frequency at an alarming rate. So far just having cold running water is luxury enough. My proposed alternative water heating project is on hold due to lack of funds. Costed the entire job and it came to £72 odd. That total was a combination of eBays cheapest and ScrewFixs. Hardcore bargain hunting. Still, £72 is £72 more than I can afford. I could buy the parts solely off eBay in dribs and drabs, but of course it would cost more overall.
I could save, however life finds a way of presenting other expenses of seemingly more importance.
The weather has been poor but forecasted to improve. Will be refreshing to return to the numerous outdoor projects requiring my attention.

The Hub, steadily progressing.

Life emerging all around us.


Garlic - The first of our seedlings poking through.

M Jones

Saga Of The Boiler - Tuesday 22/02/11

The boiler saga continues. Monday, I gave it a test. Tap sprang a leak again. Ok. Ditch the tap. Shoved in a stick to bung the pipe. Turned on the water, fired up the boiler. Lots of splurting and judders but hot water came through. Success? No.
My repair soon failed and once again the boiler began to leak. This time if silicone and milliput don't work I'll bypass the damn thing. My ideas are as follows;

A coil of black pipe on the roof will serve as the first stage primary heating, this I plan to then run to a section of copper piping behind the wood burner. In theory that should suffice and provide hot water all year, but as a back up I hoped I could run it to the gas boiler. This whole circuit will be closed i.e no header or expansion tank, protected by a safety valve.
One thought was to re-use the cistern of the redundant WC toilet, but this would require an in-line 12 volt pump due to the pressure loss it would cause.
I have a vague idea how it will all come together and Simon D assures me that what I propose could work. I hope so. I want that shower.

M Jones

A Shot At Competence - Sunday 20/02/11

Thursday was the second day of the consensus training. Took some time in the morning to cut and chop wood whilst the sun shone and the sky was blue. Sometime in the afternoon, after many coffees and relaxing, Emma and I planted some more hedging.
Friday I hung around outside helping Kit assemble another woodshed for most of the day. In the afternoon we mixed a small amount of mortar and built up the corners of the house. That way, all I have to do is join them up ensuring they meet the levels.
Saturday morning I hitched a ride with Nick into Crymych and bought £15 worth of water pipe and fittings. Between sorting and moving our little caravan for another volunteer, I rigged up the pipe. All connected, I opened the valve up and sauntered back to our static dreaming of running water and the luxury of a hot shower.
As I opened the door, my dreams evaporated. Emma was combating a cascade of water erupting from the boiler in the kitchen. Balls. As I'd feared over the winter  and suspected after we took delivery of the van, the boiler had blown a pipe. Consulted Ayres on his recent repair job, and followed his advice of J-B WELD
and Milliput . This meant a 24hr wait for it to cure.
Today I waited patiently for the repair to set. I busied myself with some track way maintenance for a neighbouring house, and Kit prepared to leave. After his departure, Nick and I murdered two more cockerels.
The first one was a beautiful dispatch. One shot to the back of the head and he was obviously dead. The other cockerel was none too happy and attacked Nick as he advanced to stick a knife in his dead chums brain.
The second was not so easy. Again, a shot to the back of the head followed by cartwheels, but he needed two more after that. Not good when Cassie and her son Davey were watching. Still, was all over very quickly and I think she was satisfied by my competence.
By now it was time to test my boiler repair - Boiler fixed, but now there's a leak and a crack in the pipe under the hot tap in the bathroom. Have got to wait another 24 hours whilst the silicone sets.
Will I ever get a shower?



Cap'n Van Winkles Walking Stick


Katy and Leanders Roundhouse, minus tarps!!


M Jones